Show the exact proposed action

An approval should make clear what the reviewer is authorising. In an illustrative invoice exception, show the current purchase-order reference, the proposed correction and the records supporting it. A broad instruction to approve a batch can hide materially different decisions inside one action.

Give the reviewer enough context to assess the change without reconstructing the whole case. Identify the affected record, the reason for the proposal and any missing evidence. When information is inconsistent, keep that uncertainty visible and provide a way to decline or return the case.

Check the authority to decide

Agree which role can approve the action, including any value limits or separation of responsibilities the business requires. Access to view a record does not by itself establish authority to change it. Confirm the relevant permission when the decision is made.

Plan for absence and escalation. A substitute reviewer needs the appropriate authority and context. If nobody is available, the workflow should hold the case or use the agreed manual route. Quietly bypassing the decision would change the control that the business accepted.

Keep the decision tied to its proposal

Record the version of the proposal that was reviewed. If an amount, reference, destination or supporting record changes materially, ask for a new decision. An approval of one state should not silently authorise another.

Set a useful validity period where circumstances can change. Before execution, check that the approval still applies and that the action has not already completed. These checks deserve particular attention when a workflow retries after a timeout or reconnects to an unavailable system.

Record execution separately

An approved proposal is not evidence of a completed action. Capture whether the destination system accepted the change and whether the expected result can be verified. A timeout may leave the outcome uncertain, so the next step should establish what happened before repeating the action.

Keep a practical record that connects the proposal, reviewer, decision, attempted action and observed result. Retain only the information appropriate to the agreed purpose and data-handling arrangements. Decide who can access the record and who investigates an exception.

  • The proposed change and its supporting record references.
  • The reviewer, authority and time of the decision.
  • The approved version and any expiry or conditions.
  • The actual result, unresolved state and next responsible owner.

Test the cases that challenge the control

Include rejection, changed data, expired approval, insufficient permission, duplicate requests and an unavailable destination in the evaluation. Check that the team can understand and resolve each state. A control that works only on the ordinary path leaves important operating questions unanswered.

Scale the design to the risk and the workflow. The purpose is a review that supports a sound business decision and a traceable result. Agree the controls, evidence and recovery arrangements before operational use, then revisit them when the workflow changes.

An original Theory Y editorial note. Apply the ideas to the scope and responsibilities of the work you are considering.